June 9
Foundation is complete. Framework is under way, and pilings for the front porch have been built.
|
|

June 9
Side view of the framed house, with its energy-efficient crawl space below. |

June 9
View of home next door (also by Edgerton Contracting, Inc.) and Buckroe Beach beyond. |
|

June 21
Back side of the home, with framing complete and foundation in place for the garage |

June 21
Framed front of the house. |
|

June 21
A peek at the wall structure, an energy-efficient design that allows for better insulation between the studs. |

June 21
After a rainstorm, general contractor Ricky Edgerton describes how the house's next-generation Advantech flooring is more stable and water resistant than standard plywood... with a 50-year guarantee!
|
|

July 5
Partial beach view seen from the front yard
of the Charity House. |

July 5
House has been wrapped, with the roofing and dormer now in place. Framing for the porch roof has also been completed!
|
|

July 5
The house also now sports most of its windows. These double-hung windows are energy-efficient and feature craftsman-style panes. |

July 5
Side view of the house, with framing in place for garage in back. |
|

July 5
A peek inside the front door reveals the staircase taking shape. |

July 7
Sign is installed to announce the house's name and the fact it's a Charity House. Wrapping is added to dormer. |
|

July 7
Smaller sign added to the back of the house, beside the newly wrapped garage. Windows have just been installed on the back of the house. |

July 18
A roof is added to the porch framing,
and the framework for the porch floor is placed. |
|

July 18
Top trim on the house is painted a crisp white.
The dormer will be soon to follow. |

July 28
Charity House contractor Ricky Edgerton shows off the latest addition: a beautiful leaded-glass front door (complete with rot-resistent door frame). He also points out the energy-efficient insulation, which attaches without staples and has been foam-sealed to prevent any air seepage. |
|

July 28
The house's convenient
central vacuum system is set up. |

July 28
An oversize tub has been added to the downstairs master bathroom, along with a full-body steam shower to its left. |
|

July 28
The stairwell is now accessible to our photographer, giving us our first look at the spacious landing, with one more step up to the top floor. |

July 28
Ricky gives us a peek at thick foam insulation in the attic
(not a feature in your standard home!), seen from the central loft space on the second floor. |
|

July 28
The heating unit has been installed,
and boasts a nearly 95% efficiency. |

July 28
The first walls (courtesy of Grandview Drywall) go up, starting in the second-story bedrooms and bath. |
|

July 28
Great water view from the second-story bedrooms. |
Proceeds from the sale
of this home will benefit
the children of: